To help our esteemed consumers as well as applicants of new connections following time limits are decided for completion of various works except during emergency. Further for any services Dy. Engineer / Jr. Engineer or billing staff of our sub division can be contacted, who shall provide the complete information.

 

 

A.

For new electric connection

 

K

Shifting of electrical connection in existing place, after the date of payment of estimate.

A1.

Time limit for issue of Demand Note

(From the date of registration with required documents).

 

 

 

1

Permanent electric connection for residence & commercial

7 days

2

Permanent electric connection for Industrial LT

10 days

3

For HT connection

15 days

4

For EHV connection

30 days

 

 

 

1

Meter / Service line

7 days

2

If service line is disconnected from outside the building

20 days

3

Transformer structure

30 days

D

Change of name or ownership of electrical connection (from the date of application, required documents & payment of fees.

7 days

E

Complaint Redressal Time (From the time of complaint)

Generally, the work of complaint redressal at consumer’s installation will be carried out from morning 8=00 AM to 8=00 PM, the remaining complaint will be redressed next day

A2

Time limit to release connection (From the date of payment of Demand Note & on completion of related consumers’ & departmental work

 

E1

Electrical interruption

 

Urban area

 

Rural area

 

 

 

 

 

1

Permanent electric connection (in Category A of existing network).

20 days

2

Permanent electric connection

(In case of modification in existing network ).

2 months city area

4 months rural area

3

Permanent electric connection for LT Industrial

(in Category A of existing network)

20 days

4

Permanent electric connection for LT Industrial

(In case of modification in existing network ).

60 days

5

HT Industrial connection

45 days

6

EHV electric connection

180 days

7

Temp electric connection

10/25/50 KVA & above

5-10-20-30 days

 

 

 

 

1

Complaint of ordinary nature.

4 hours

24 hours

 

2

Due to blowing of DO fuse

6 hours

24 hours

3

Routine line fault

8 hours

24 hours

4

Slipping of HT line conductor.

8 hours

24 hours

5

Falling of tree on HT line

10 hours

24 hours

6

Snapping of conductor

12 hours

24 hours

7

Breaking of pole

24 hours

48 hours

8

Due to fire on short circuit of LT line

6 hours

30 hours

9

Fault in Dist Transformer

1 day

3 days

10

 

Fault in power transformer or related switch gear.

Within 2 days Reconnection of supply if technically feasible, pending remaining work within 15 days.

11

 

Fault in service line

A-Overhead line

B-Underground line (after getting permission of road digging).

 

 

24 hrs

3 days

 

 

48 hours

3 days

B

Reconnection of electrical connection (after the payment of reconnection charge, due payment & Security Deposit.)

 

 

E2

Meter / Metering system

Urban area

Rural area

 

 

 

 

 

1

If electrical supply is not disconnected more than 6 months.

24 hours

2

If service line is not disconnected from outside of building.

3 days

3

If electrical supply is  disconnected more than 6 months, after the submission of test report & if company’s equipments are lying at consumer’s place.

48 hours or otherwise 7 days

4

If Agreement is terminated then consumer has to apply afresh.

 

--

 

 

1

Inspection at site.

7 days

15 days

2

To inform consumer about defect after inspection at site.

15 days

15 days

3

Request for replacement of meter

7 days

7 days

E3

As regards complaint of Electricity bill

10 days

 (If visiting of place is required -  15 days)

The payment of electricity bills are accepted by Cash / Cheque / Demand Draft  on Cash Counter of Company, Agency & Post Office.